Home /Modules/docs/BRANCH-RECONCILIATION-2026-11-14.md

BRANCH-RECONCILIATION-2026-11-14.md

docs/BRANCH-RECONCILIATION-2026-11-14.md · 87 line(s) · markdown

SLeeLa branch reconciliation

Audit date: 2026-11-14 (GitHub timestamps may display as 2026-11-15 UTC) Repository: mearvk/SLeeLa Integration destination: master

Policy

Repository-level findings

Open pull requests reviewed

PRTopicBaseHeadComparison / disposition
#364Java-to-SLeeLa converter mappingmasterwork/java-converter-mapping-pass-0126 commits ahead at initial comparison; draft; CI pending/cancelled; do not merge yet
#356VM-owned Native IPC worker handlesnative-ipc-bytecode-isa-2026-11-09native-ipc-vm-handle-table-2026-11-09Stacked PR; do not retarget blindly
#354Native IPC stdio stream adaptermasternative-ipc-stream-adapter-2026-11-099 commits ahead, divergent; draft; inspect conflict and tests
#350Native math synthesis CImasterci/math-synthesis-smoke-benchmark16 commits ahead, divergent; inspect CI behavior and test evidence
#348Native linear algebramasterfeat/native-linear-algebra-foundation140 commits ahead, divergent; draft; review scope and dependencies
#347Native math VM dispatchwork/native-math-kernel-sleelactlwork/vm-native-math-dispatchStacked on #346; preserve dependency order
#346Native math kernelmasterwork/native-math-kernel-sleelactl10 commits ahead, divergent; inspect conflict and tests
#345VM exception source regressionsmasterwork/vm-exception-source-regressions4 commits ahead, divergent; inspect conflict and tests
#340Java UTF-16 String facade searchmasterwork/java-string-api-completion4 commits ahead, divergent; inspect conflict and tests
#303Recursion/syntax documentationmasterdocs/recursion-contract-audit-2026-1011 commits ahead, divergent; inspect docs against current contracts
#278Historical branch integrationmasterintegrate/merge-unmerged-branches122 commits ahead, divergent; selective recovery only

Converter PR #364 qualification gate

At the time of this audit, PR #364 head was cfb2c1b141007a25d62455a3e8a5d3b9838abde0, targeting master at 0bc4f270ae3bb50a11b4c19322e072da423d834d.

The associated check-runs response contained 18 checks: 16 queued and 2 cancelled, with no completed successful qualification result. The patch itself records remaining gaps in transactional output publication, cryptographic source/model provenance, exact JDK 28 source identity, and parity of the SLeeLa-native converter's idempotence behavior. New fixtures were explicitly not yet verified in the patch documentation.

Therefore #364 remains a draft and must not be merged until the code is reviewed, both converters pass their relevant tests, and required CI checks complete successfully.

Branches with previously merged PRs

The recent PR history records successful merges to master for build portability (#363), native method AOT gating/emission/metadata (#359, #358, #357), Native IPC bytecode foundation (#355), Windows clean-install layout (#349), VM exception foundation (#344, #341), Java UTF-16 integration (#339, #335, #333), native callback guard (#332), Native Drive (#330), UTF-4088 tooling (#322), library inventory (#315), Slecompiler API paths (#314), Java launcher fixes (#311, #309, #308, #306), runtime VM hardening (#304), UI themes (#302), and browser tabs/events (#300).

These merged PRs are evidence of integration history, not by themselves proof that every similarly named branch is safe to delete.

Required completion sequence

  1. Recompare every non-master branch with the current master tip; record ahead, behind, divergence, unique files, and any associated PR.
  2. For each open PR, inspect the complete patch, base/head relationship, dependencies, and CI results.
  3. Integrate independent, reviewed changes through PRs targeting master.
  4. Integrate stacked work only after its prerequisite has landed.
  5. For stale branches, verify their unique commits are already in master before proposing deletion; preserve branches with unresolved unique work.
  6. Verify the repository default branch remains master and ensure all new PRs target master.
  7. Re-run root build, platform builds, converter differential tests, and affected module tests after integration. Record exact commits and outcomes.

This document is an audit snapshot, not a claim that all 76 branches have been individually source-reviewed or that all open PRs are ready to merge.